Two options
Design only
If another company will do the installation.
- Site survey and consumption analysis
- Gediz EDAŞ application and follow-up
- Electrical design and design approval
- Acceptance file
Design and installation
One point of contact from application to commissioning.
- All design work
- Panel, mounting structure and inverter installation
- AC/DC wiring, grounding, lightning protection
- Provisional acceptance and commissioning
Process
Site survey and consumption analysis
We review your roof or land, your bills and your contracted power.
MCDApplication
With a notarized power of attorney from you, we file the application on your behalf through Gediz EDAŞ’s YBS portal.
MCD → Gediz EDAŞCall letter
The commission reviews the application; if approved, a call letter for the connection agreement is issued.
Gediz EDAŞDesign approval and connection agreement
We draw up the electrical design and submit it for approval. After approval, you sign the connection agreement.
MCD → Gediz EDAŞInstallation and provisional acceptance
We do the mounting and wiring and prepare the plant for acceptance. Gediz EDAŞ carries out the provisional acceptance.
MCD → Gediz EDAŞSystem use agreement
The agreement is signed and the plant starts operating in parallel with the grid.
Gediz EDAŞ
Frequently asked questions
Is my roof suitable for solar PV?
It depends on orientation, tilt, shading and the supporting structure. We check on site during the survey and assess structural suitability separately.
What happens to the excess electricity I generate?
It is offset against your consumption. For plants that received their call letter after May 12, 2019, net metering is monthly for residential subscribers and hourly for all other subscriber groups.
Does rooftop solar PV need a building permit?
In areas with a zoning plan, a system built for the building’s own needs is exempt from a building permit. You still need permission from the local authority, consent of the unit owners and construction drawings.
Who draws up the design?
Our electrical and electronics engineer with an SMM (self-employed engineer) certificate draws it up and signs it.
Who files the application?
We do, with a notarized power of attorney from you. You are the applicant; the call letter is issued in your name. We need your signature, title deed and subscription details.
Can I run it right after installation?
No. Operating in parallel with the grid before provisional acceptance counts as unauthorized use. We prepare the plant for acceptance; it goes live after the system use agreement.
Can I add a battery?
Yes, storage can be installed up to the plant’s capacity. No payment is made for energy fed to the grid from the battery; we design the system accordingly.